Submit your website to 20 Search Engines - FREE with ineedhits!

 

22.4 MW Dual Fuel GE Frame 5PA Simple Cycle Turbine

22.4 MW Frame 5P Simple cycle, 3000 rpm, 50HZ, 11,000 volt, Year: 1989, Hours: 6,621 since major overhaul, dual fuel (gas or diesel). Complete simple cycle turbine package,Disassembled and put in storage in 2009. Plant is packaged

and ready for shipment..

 
 

30 MW Dual Fuel GT10 CHP Gas Turbine Plant

Manufacturer: ABB, Model: GT-10B, Year: 1991, 50HZ, Fuel: Dual Fuel, Total operated hours: 47000 hrs, 900 starts,
Steam Turbine: ABB, Flu Gas boiler: KVV Akerlund, Output:
Gas Turbine 23 MW, Steam Turbine 7 MW, complete plant with

all auxiliaries. This plant has been well maintained and is in excellent

condition.

 
42 MW GE LM 6000 PA Dual Fuel Gas Turbine, 50HZ
42 MW, 50HZ, Year 1995, in 2004 it was completely overhauled and converted to natural gas and upgraded to dual fuel, Total hrs since overhaul only 3200 hrs. This is turbine is in excellent condition and maintained by manufacturer.

 

 
47 MW LM 5000 STIG Gas Turbine Power Plant

Model: LM5000STIG, 3000 rpm, 11.5KV, 50HZ, Year: 1990 Single cycle output power: 31427 KW, STIG power output 47020 KW, Fuel: Light Diesel Oil, Complete Plant.

 

 

66.9 MW Pratt & Whitney Dual Fuel Turbine Power Plant

Model  FT8-1 twin gas turbines, steam turbine and boiler,3000 rpm, 10.5KV, 50HZ, Installed in 1996, overhauled in 2005/2006, upgraded to dual fuel in 2007. Both units have under 1400 hrs since overhaul. This turbine is in excellent condition and maintained by manufacturer. Complete combined-cycle power plant.

 

 

105 MW Siemens V94.2 Gas Turbine Power Plant

GT V94.2 Siemens heavy-duty gas turbine, will operate on distillate-oil liquid and natural gas, 10.5 kV, 50HZ, Year 1982, Complete plant, well maintained.

 

 

378 MW Gas Turbine Power Plant

Consists of two (2) 37 MW, PG 6531 Dual Fuel Turbines,

One (1) 121 MW, PG 9171 E Gas Turbine, Four (4) Steam Turbines: 31 MW, 35 MW, 56 MW and 60 MW, Two (2) HRSG and Boiler. Complete Plant. ONLY SOLD AS A COMPLETE PACKAGE.

 

 
 
New 501 MW 7FA Dual Fuel Combined Cycle Power Plant

Consists of two (2) GE PG 7241 Gas Turbines and one (1) GE Condensing Steam Turbine at 60HZ, Combined cycle Heat rate (LHV) 6,157 BTU/KWH.  Contact us for more information.

 

 COAL FIRED TURBINES
 
 

Three (3) 50MW Coal Fired Steam Turbines, total 150 MW

62.5 MVA, 10.5 KV, 3000 rpm, 50HZ, Year 1994 and 1995, Boiler type single steam natural convection coal dust boiler.

Contact us for information
 

 

110 MW Coal Fired Power Plant

Consisting of Two (2) 55 MW Steam Turbines, 3000 rpm, 50HZ, Year: 2005, Boilers: 240 ton/hr, 540 deg C , 9.8Mpa,,

Complete Plant

 

 

 

Two (2) 125MW Coal Fired Steam Turbine Generation Sets

3000 rpm, 50HZ, Year 1989, Voltage: 13800V, 2004, up graded the

DCS, DEH systems to improve efficiency. Main steam pressure: 135 kg/cm², max.140 kg/cm²,min 130 kg/cm²Main steam temperature: normal 535°C, max: 555°C, min 520°C, Exhaust steam pressure: 0.05 kg/cm² Complete plant, accept for boilers, which will not be included.

 
 

Two (2) 135 MW Coal Fired Power Plants

Two Twin cylinder steam turbines, Year: 2003 to 2005, 137 MW, 13800 volt, 50Hz, Boiler: 420ton/hr, 13.7MPa, output temp 540deg C, inlet temp: 247.93deg C, eff: 91.79%. Complete plant with coal and ash handling system, water system,

chemical system, electrical and control system. Total 270 MW

Contact us for more information

 
 

Unused 135 MW Coal Fired Steam Turbine

This system is unused and complete with all accessories. Most parts

still in original crates, 50HZ, Boiler Steam specs: 440Ton/hr, 13.24MPa, 535 deg C, Contact us for more information.

 
CONTACT US
 
 

Tel:  902-442-2771

        902-442-3633

Fax: 902- 281-2089

Email: pbmtww@eastlink.ca

           rose@generatorsforsale.ca

Website: http://www.generatorsforsale.ca

Make a Free Website with Yola.